The deposit consisted of auriferous quartz veins. Xinhai offered tailored solutions to the project, and crude ingots were produced as final products after smelting.
The Zimbabwe 700t/d gold mineral processing plant was an EPC+M+O project. The raw ore had a gold grade of up to 6g/t. Xinhai worked to ensure environmental protection and workplace safety, optimize plant layout, and shorten construction duration.
The raw ore had an Au grade of 5.75g/t, a true density of 2.62t/m3 and a bulk density of 1.32t/m3, with gold being the major valuable mineral.